
Luxury Master Suite Bath
Location
Temecula, CA
Date
July 2025
Duration
3 weeks
The Vision
"Transforming a standard master bath into a spa-like retreat with marble tile, a walk-in shower, and a custom double vanity."
The Challenge
The existing bathroom had a small fiberglass shower, a large unused garden tub taking up prime floor space, and outdated laminate vanity tops. The layout was inefficient and the materials were significantly outdated.
Our Solution
We removed the garden tub to create room for a large walk-in shower with dual rain heads and floor-to-ceiling marble tiling. A custom double vanity with quartz countertops, soft-close drawers, and backlit LED mirrors was installed. New waterproofing was added throughout.
Materials Used
Key Results
Converted wasted garden tub space into a luxury walk-in shower
Added modern, efficient plumbing fixtures reducing water usage
Created a spa-quality aesthetic matching the wine country setting
Improved storage capacity by 50% with custom vanity
Project Insights & FAQs
Q: Can you remove a garden tub to add a larger shower?
A: Absolutely. This is one of the most common requests we receive. It requires plumbing rerouting but significantly increases usable shower space.
Q: How long does a full master bath remodel take?
A: This project took 3 weeks. Complex marble work requires careful curing time between stages.
Start Your Transformation
Love this project? Let's discuss how we can bring a similar level of excellence to your home.